CIVIL AND INFRASTRUCTURE  ENGINEERS  
Topic Software  Duration Date Cost  per Person
Road & Highway  Planning and Design Using  AutoDESK Civil 3D Civil 3D 3 days  24-26 Jan 2019 ₦100000
Reinforced Concrete Design using SAP2000/Orion/Prota Structure Orion 18 /Prota Structure 3 days 6-8 Feb 2019 27-29 March 2019 ₦100000
Design and Modelling of Concrete Bridge Using Bentley Leap Software Bentley Leap Software 3 days 17-19 Jan 2019  14-16 March2019 ₦100000
Cost Engineering, and Use of MS Project software with  Excel for Costing and Project Management MS Project, Excel, Estimator 3 days    21-23 Feb 2019 ₦100000
         
WATER AND MECHANICAL ENGINEERS  
Topic Software duration Date Cost per person
Planning, Design and modelling of Water Distribution/ Reticulation System Using Epanet EPANENT 2 days 14-15 Feb 2019        21-22 Mar 2019 ₦75000
Integrated Watershed Modelling for Erosion and Flood control using GIS & HEC-RAS GIS, Excel , Access 3 days 24-26 Jan 2019      21-23 Mar 2019 ₦75000
 Design of Dams, Bridges and Hydraulic structures  Excel, GIS 3 days 17-19 Dec 2018       6-8 Feb 2019 ₦75000
Design of Sewers and Urban Drainage System SWMM, GIS, HEC-RAS 2 dayss 21-22 Feb 2019   29-30 Mar 2019 ₦75000
         
         
         
         
         
         
         
         
         
         
         
         
ENVIRONMENTAL AND CHEMICAL ENGINEERS 
Topic Software Duration Date Cost per person
Environmental Informatics(Application& Uses) Excel, Access 2 days 25-26 Jan 2019 15-16 Mar2019 ₦75000
Planning and Design of Wastewater Treatment Plant STOAT,SWMM 2 days 30-31 Jan 2019 27-28 Mar 2019 ₦75000
Statistics, Database,and Information Processing   for Engineers Excel, Access 2 days 8-9 Feb 2019      22-23 Mar 2019 ₦75000
         
MECHANICAL AND ELECTRICAL ENGINEERS
Topic Software Duration Date Cost per person
Mechanical Piping and Plumbing Design of Building quickplumb, REVIT MEP 2 days 25-26 Jan 2019 29-30n Mar 2019 ₦75000
Electrical Wiring Services and Load Estimation of Building AutoCAD, REVIT-MEP 2 days 7-8 Feb 2019        27-28 Mar 2019 ₦75000
Cost Engineering, and Use of MS Project software with  Excel for Costing and Project Management MS Project, Excel, Estimator 3 days 6-8 Dec 2018       21-23 Feb 2019 ₦100000